Skip to main content

Authority

Hampton Roads Sanitation District (HRSD)

Regional wastewater treatment authority for southeast Virginia. FY2026 Wastewater Facility Charge effective July 1, 2025, assessed per water meter size.

Authority identity

Type
Regional wastewater treatment authority (a political subdivision of the Commonwealth of Virginia).
Governing body
HRSD Commission. The Commission adopts the annual Rate Schedule; the FY2026 Rate Schedule is effective July 1, 2025 through June 30, 2026.
Service area summary
HRSD provides regional wastewater treatment and conveyance to roughly 18 cities and counties across Hampton Roads plus Middle Peninsula small communities, including Virginia Beach, Norfolk, Chesapeake, Newport News, Hampton, Portsmouth, Suffolk, Poquoson, Williamsburg, James City County, York County, Isle of Wight, and Gloucester. The HRSD Wastewater Facility Charge is a regional capacity charge applied in addition to each locality's own sewer connection fee, and is collected at building-permit time by the local jurisdiction on HRSD's behalf.
Website
hrsd.com

Jurisdictions served

HRSD is the regional wastewater authority for the Hampton Roads localities below that ZoneFee currently covers. The facility charge on this page is additive to each locality's own sewer connection fee.

HRSD's full footprint includes Norfolk, Chesapeake, Newport News, Hampton, Portsmouth, Suffolk, Poquoson, York County, Isle of Wight, Gloucester, and several Middle Peninsula small communities that are outside current ZoneFee coverage.

Fee types administered

  • Wastewater Facility Charge (development-side regional wastewater capacity / connection cost, assessed per water meter size)

HRSD's per-volume wastewater treatment rates, high-strength surcharges, nutrient credits, hauled-wastewater rates, and miscellaneous account or billing fees are operating-bill items, not development connection costs, and are excluded from this page.

Fee schedule

Source: HRSD FY2026 Rate Schedule, Section 25 (Wastewater Facility Charge), effective July 1, 2025. All values verbatim from the canonical FY2026 Rate Schedule PDF; see the Source block below for primary-source provenance and SHA-256 hash. These volume-based facility charges apply to all connections and are due and payable prior to the issuance of a building permit or sewer permit by the local jurisdiction.

Water meter size Wastewater Facility Charge Effective date
5/8-Inch$2,5402025-07-01
3/4-Inch$4,2752025-07-01
1-Inch$7,6852025-07-01
1 1/2-Inch$19,1752025-07-01
2-Inch$37,3002025-07-01
3-Inch$95,2502025-07-01
4-Inch$185,2402025-07-01
6-Inch$473,0402025-07-01
8-Inch$919,9902025-07-01
10-Inch$1,541,2102025-07-01
12-Inch$2,349,3452025-07-01
14-Inch$3,355,4252025-07-01
16-Inch$4,569,2002025-07-01

The facility charge covers the cost of treatment and conveyance capacity consumed by new connections, new development, or redevelopment resulting in increased wastewater volume or higher-strength waste. For development at a property previously connected to an existing sanitary sewer tap, the facility charge is waived for equivalent flow capacity. A property previously served by a septic tank that connects to the sewer system may also have the charge waived for equivalent flow capacity. Redevelopment that changes meter number or size is charged the difference at present rates; no refund is issued for decreased capacity.

Source

Hampton Roads Sanitation District (HRSD), a political subdivision of the Commonwealth of Virginia - HRSD Rate Schedule Fiscal Year 2026 (Effective July 1, 2025 - June 30, 2026), Section 25 Wastewater Facility Charge - FY2026 Rate Schedule (PDF) - accessed 2026-06-01 · pdfplumber

Source content hash (SHA-256): 25f95a0f448085913559ab4fe4b862c7b9f16afc1497ee10c728de9cf2590933

The FY2026 Rate Schedule PDF is directly reachable from hrsd.com (HTTP 200, no anti-bot block). The verbatim 13-tier Wastewater Facility Charge schedule was extracted from Section 25 with the explicit FY2026 effective date printed on the document cover and page headers.

Last verified

Verified Last reviewed 2026-06-01. Schedule has an explicit effective date of 2025-07-01.

Fee schedules administered by HRSD change over time, typically with each fiscal-year Rate Schedule adoption. ZoneFee captured the schedule from the source named above on the last-verified date. The HRSD facility charge is in addition to the local jurisdiction's own sewer connection fee. For binding fee amounts on a specific project, contact HRSD and the local jurisdiction directly via the official websites above.