Public water and wastewater authority for Loudoun County, Virginia. Combined-utility connection-side fee schedule effective January 1, 2026.

Authority identity

Type
Combined water and wastewater utility authority (public, non-profit).
Governing body
Loudoun Water Board of Directors. Public, non-profit water and wastewater authority chartered under VA Code Chapter 1100 of the Acts of Assembly 1959.
Service area summary
Eastern Loudoun County, Virginia. Central service area includes Ashburn, Sterling, and the Dulles area. Wholesale water purchased from DC Water and Fairfax Water.
Website
loudounwater.org

Jurisdictions served

Loudoun Water serves one jurisdiction covered by ZoneFee.

Fee types administered

  • Plan review fees (water, wastewater, reclaimed water; per linear foot of main extension)
  • Inspection fees (water, wastewater, reclaimed; CCTV; record drawing review)
  • Meter charges (residential and commercial install fees; meter costs by size and technology)
  • Availability charges (system development charges per Equivalent Residential Connection, paid one-time at service initiation)
  • Estimated-flow availability charges (large-meter and high-demand projects, per GPD)

Fee schedule

Source: Loudoun Water Rates, Fees, Charges and Penalties effective January 1, 2026 (Board-adopted Rates, Rules and Regulations). All values verbatim from the canonical landing page; see the Source block below for primary-source provenance and SHA-256 hash. Loudoun Water's full retail water and sewer usage-rate blocks are on the source page; the development-side cost components captured here cover the one-time charges a project owner pays at plan submittal, inspection, meter set, and service initiation.

Plan review fees

Fee type Amount Unit Effective date
Plan review - Water$630.00 + $0.53base + per linear foot2026-01-01
Plan review - Wastewater$630.00 + $0.67base + per linear foot2026-01-01
Plan review - Reclaimed water$630.00 + $0.53base + per linear foot2026-01-01
Plan review - Non-linear, up to $5M project2.5%of project cost2026-01-01
Plan review - Non-linear, $5M to $10M2.0%of project cost2026-01-01
Plan review - Non-linear, $10M to $15M1.5%of project cost2026-01-01
Plan review - Non-linear, over $15M1.0%of project cost (minimum $10,000 per submission)2026-01-01

Inspection fees

Fee type Amount Unit Effective date
Inspection - Water$360.00 + $3.74base + per linear foot2026-01-01
Inspection - Wastewater$360.00 + $4.11base + per linear foot2026-01-01
Inspection - Reclaimed water$360.00 + $3.74base + per linear foot2026-01-01
CCTV inspection - Wastewater$720.00 + $1.70base + per linear foot2026-01-01
Record drawing review - Water$630.00 + $2.26base + per linear foot2026-01-01
Record drawing review - Wastewater$630.00 + $1.94base + per linear foot2026-01-01

Meter charges

Fee type Amount Unit Effective date
Meter install - Residential$270.00per meter2026-01-01
Meter install - Commercial$420.00per meter2026-01-01
Failed meter install$55.00per visit2026-01-01

Meter costs (by size and technology)

Meter Amount Unit Effective date
3/4" Residential$460.00per meter2026-01-01
1"$569.00per meter2026-01-01
1" Fire Residential$606.00per meter2026-01-01
1-1/2" Commercial$2,321.00per meter2026-01-01
2" Magnetic$7,876.00per meter2026-01-01
2" Ultrasonic$2,333.00per meter2026-01-01
3" Magnetic$8,149.00per meter2026-01-01
3" Ultrasonic$3,039.00per meter2026-01-01
4" Magnetic$8,230.00per meter2026-01-01
4" Ultrasonic$4,101.00per meter2026-01-01
6" Magnetic$8,869.00per meter2026-01-01
6" Ultrasonic$6,851.00per meter2026-01-01
8" Ultrasonic$7,564.00per meter2026-01-01

Availability charges (Table 2, flat rate by meter size and ERC)

Service class ERC Water availability Sewer availability Effective date
3/4" Residential (MDW 550 GPD, ADS 275 GPD)1.0$8,592.00$11,360.002026-01-01
1" UL Rated Residential w/ Fire Line1.0$8,592.00$11,360.002026-01-01
Multi-Family (per unit)0.65 / unit$5,584.80$7,384.002026-01-01
3/4" Commercial1.5$12,888.00$17,040.002026-01-01
1" Commercial3.0$25,776.00$34,080.002026-01-01
1-1/2" Commercial6.5$55,848.00$73,840.002026-01-01
2" Commercial12.0$103,104.00$136,320.002026-01-01

Estimated-flow availability (Table 3, over 2-inch or high-demand projects)

Component Amount Unit Effective date
Water - Max day flow$15.62per GPD2026-01-01
Sewer - Average day flow$41.31per GPD2026-01-01

Availability charges are the development-impact / system-development charges, paid one time per ERC at service initiation. The water and sewer usage-rate blocks on the same source page are operating-bill components and are not reproduced here.

Source

Loudoun Water (public utility authority chartered under VA Code Chapter 1100 of the Acts of Assembly 1959) - Rates, Fees, Charges and Penalties - https://www.loudounwater.org/rates-fees-charges-penalties - accessed 2026-05-08 · fetch

Source content hash (SHA-256): def3d755980474fea7ffe66b1572a2931738392919442b15971e363e46f8f3e2

Effective date 2026-01-01 verbatim from the Board-adopted Rates, Rules and Regulations. The full schedule (plan review, inspections including CCTV and record drawing, meter charges and meter costs by size, availability charges by ERC and meter size, estimated-flow availability for large meters) was captured from the canonical landing page in a single fetch. No secondary corroboration is required for a Board-adopted schedule published on the authority's own rates page.

Last verified

Verified Last reviewed 2026-05-08 against the canonical Loudoun Water /rates-fees-charges-penalties landing. Schedule has an explicit effective date of 2026-01-01.

Fee schedules administered by Loudoun Water change over time. ZoneFee captured the schedule from the source named above on the last-verified date. For binding fee amounts on a specific project, contact Loudoun Water directly via the official website above.