Lubbock, Texas - City Development Fees

Lubbock | City | South Plains / Llano Estacado (West Texas regional center; Texas Tech University; US-84 / I-27 / Loop 289 corridor) | Lubbock, TX MSA | Lubbock County seat

Lubbock is the regional center of the South Plains and the seat of Lubbock County, anchored by Texas Tech University and sitting on the US-84, I-27, and Loop 289 corridors. The City's development-side charges come from three current, directly-published official documents: the 2026 Planning Department Fee Schedule (zone change, plat, variance, special exception, annexation, and zoning verification fees), the Building Safety Fee Schedule (building, mechanical, plumbing, and electrical permit fees, plan review, and contractor registration, on the Fiscal Year cycle effective October 1, 2025 under Adopted Budget Ordinance No. 2024-O0111), and the Public Infrastructure Plan Review, Testing and Inspection Fees (water, sewer, paving, and drainage review for development engineering). Lubbock also administers a Texas Local Government Code Chapter 395 impact-fee program, but the City has currently set all impact fees to $0.00 for all areas, so the real developer-facing cost in Lubbock is the application, permit, and plan-review fees below.

On this page
  1. Fee summary
  2. Zoning, development, and building permit fees
  3. Impact fees
  4. Utility tap fees
  5. Coverage notes
  6. Fee authorities
  7. West Texas peer jurisdictions
  8. Sources

Fee Summary

Fee Type Status Top-Line Figure Effective Date
Zoning, Plat, Variance, and Building Permit Fees Confirmed Zone change $500 + $5/additional acre; preliminary plat $150 + $35/acre (max $7,000); new single-family / duplex building permit $0.15 per sq ft; new commercial / multi-family $0.20 per sq ft; minimum permit fee $75 2025-10-01
Impact Fees (TLGC Ch. 395) Confirmed Current collection rate $0.00 for all impact fees in all areas (roadway, water, wastewater); the 2025 roadway study per-service-unit figures are the maximum-assessable basis, not amounts charged Current
Utility Tap / Connection Fees Unavailable via official sources Lubbock publishes no consolidated developer water / sewer tap dollar schedule; taps are installed by City-registered private contractors at developer expense, and the City-side capacity charge is the water / wastewater impact fee (currently $0.00) -
Cash Proffers Does not apply Cash proffers are a Virginia statutory framework only; Texas jurisdictions do not use them -
Special District Fees (PID) Not administered by this jurisdiction Lubbock's Public Improvement Districts levy annual special assessments on the tax roll, not a developer-facing permitting fee -

Zoning, Development, Subdivision, and Building Permit Fees

Source: City of Lubbock 2026 Planning Department Fee Schedule (SHA-256 f73399ce...), Building Safety Fee Schedule (Fiscal Year effective October 1, 2025 - September 30, 2026; Adopted Budget Ordinance No. 2024-O0111; SHA-256 4c1805dc...), and Public Infrastructure Plan Review, Testing and Inspection Fees (November 2023; SHA-256 0cc70221...). The schedules are comprehensive; a representative subset is rendered below. All three documents were fetched directly from the City of Lubbock DocumentCenter and captured verbatim this pass via pdfplumber.

Land-Use and Development Application Fees

Fee ItemAmount
Zone Change$500.00 + $5.00 per additional acre
Preliminary Plat$150.00 + $35.00 per additional acre (maximum fee $7,000)
Final Plat$350.00 + $55.00 per additional acre (maximum fee $5,000)
Vacating Plat$200.00
Amended Plat$250.00
Variance / Special Exception (Residential)$200.00
Variance / Special Exception (Commercial)$500.00
Design District Variance$250.00
Local Historic Landmark Designation$50.00
Certificate of Appropriateness$50.00
Petition Annexation Request$1,500.00
Zoning Verification Letter$50.00

Building and Trade Permit Fees

Fee ItemAmount
Building Permit - New Single Family / Duplex$0.15 per sq ft of gross floor area under roof
Building Permit - New Commercial / Apartment / Multi-Family$0.20 per sq ft of gross floor area under roof
Commercial Shell / Tenant Finish-Out$0.10 per sq ft of gross floor area under roof
Minimum Permit Fee (all permits)$75.00
Commercial Plan Review25% of building permit fee (first revision $0; subsequent revisions 5%)
Mechanical / Plumbing / Electrical - New Construction$0.07 per sq ft of gross floor area under roof

Public Infrastructure Plan Review and Drainage (Development Engineering)

Fee ItemAmount
Public Infrastructure Plan Review - Water$100.00 minimum + $0.25 per linear foot
Public Infrastructure Plan Review - Sewer$100.00 minimum + $0.30 per linear foot
Public Infrastructure Plan Review - Paving$100.00 minimum + $0.50 per linear foot of curb
Public Infrastructure Testing and Inspection$200.00 minimum + per-unit charge by improvement type
Drainage Analysis Report Review - Rational Method$300.00
Drainage Analysis Report Review - Unit Hydrograph$600.00
Drainage Analysis Report Re-Review$100.00

Impact Fees - TLGC Chapter 395 (Current Collection Rate $0.00)

Source: City of Lubbock Impact Fees page (SHA-256 5018e148...) and the 2025 Roadway Impact Fee Study Update (SHA-256 378e896d...). Lubbock administers a Texas Local Government Code Chapter 395 impact-fee program covering roadway across eight service areas plus citywide water and citywide wastewater. The water and wastewater impact fees were adopted in 2020 with a collection rate of $0. The program is administered through the City's Capital Improvements Advisory Committee under Chapter 395.

What developers actually pay today: $0.00. Per the official Impact Fees page, "The City of Lubbock has currently set all Impact Fees to $0.00 for all areas." Developers currently pay $0 in roadway, water, and wastewater impact fees in Lubbock.

Current Impact Fee Collection Rate

Impact FeeCurrent Collection Rate (amount paid)
Roadway Impact Fee (all eight service areas)$0.00
Water Impact Fee (citywide)$0.00
Wastewater Impact Fee (citywide)$0.00

Maximum-Assessable Roadway Basis (NOT Collected)

The figures below are the maximum-assessable roadway impact fee per service unit (vehicle-mile) from the 2025 Roadway Impact Fee Study Update. They are the legal maximum-assessable basis used to size the program under Chapter 395; they are NOT the adopted collection rate and are NOT charged to developers. The amount currently collected for every service area is $0.00.

Service AreaMaximum-Assessable per Service Unit (basis only, not collected)
Service Area A$1,714 (collected at $0.00)
Service Area B$921 (collected at $0.00)
Service Area C$1,745 (collected at $0.00)
Service Area D$1,283 (collected at $0.00)
Service Area E$1,728 (collected at $0.00)

Note: Service Areas F, G, and H are included in the full 2025 study. The roadway study sets the maximum the City could legally assess; the adopted collection rate is what determines developer cost, and that rate is currently $0.00 for all areas.

Water and Sewer Tap / Connection Fees

The City of Lubbock does not publish a consolidated developer-facing water or sewer tap or connection fee dollar schedule. Physical water and sewer taps are installed by City-Registered Tap Contractors, that is, private contractors at developer expense, and the City-side utility capacity charge for new development is the water and wastewater impact fee, which the City has currently set to a $0.00 collection rate.

At least four official surfaces were probed this pass and none carried a standalone developer tap or meter-set dollar schedule: the Financials and Rates page (Annual Financial Reports and bond official statements only), the Registered Tap Contractors page (the Registered Water and Sewer Contractor Form plus the Public Infrastructure Review Fees, no tap or meter dollar schedule), the Water Utilities Department page (no fee schedule asset), and the Building Safety Fee Schedule (only a $75.00 plumbing Water Line Permit, which is a plumbing permit rather than a utility capacity charge). Closed-search outcome: unavailable via official sources. The development-side water and wastewater capacity charge is the impact fee, currently collected at $0.00.

Coverage Notes - What This Page Does Not Cover

Per ZoneFee's Partial-Verified Publication Standard, the items below were not closed via confirmed developer-facing fee amounts on this page. They are disclosed here rather than estimated or omitted silently.

Utility Tap / Connection Fees

As detailed above, Lubbock publishes no consolidated developer water or sewer tap fee schedule. Physical taps are installed by City-registered private tap contractors at developer expense, and the City-side capacity charge for new development is the water and wastewater impact fee (currently $0.00). Closed-search outcome: unavailable via official sources.

Cash Proffers

Cash proffers are a Virginia statutory framework only (Va. Code 15.2-2303 and 15.2-2303.4); Texas jurisdictions do not use cash proffers. Developer-side contributions in Lubbock occur through the Chapter 395 impact fees (currently collected at $0.00) and the zoning, plat, and permit application fees. Closed-search outcome: fee family does not apply.

Special District Fees (PID)

The City of Lubbock maintains numerous Public Improvement Districts (including Bell Farms, Cypress Ranch, North Overton, North Point, Northwest Passage, Quincy Park, and Upland Crossing), but a PID levies an annual special assessment on property within the district collected through the tax roll, not a developer-facing application or permitting fee in ZoneFee scope. The 2026 Planning Department Fee Schedule and the Building Safety Fee Schedule contain no PID petition or creation fee and no MUD developer fee line items. Closed-search outcome: not administered by this jurisdiction.

Fee Authorities

Authority Fee Types Official Website
City of Lubbock Planning Department Zone change, preliminary / final / vacating / amended plat, variance and special exception, design district variance, historic landmark designation, certificate of appropriateness, petition annexation, and zoning verification letter fees - in the 2026 Planning Department Fee Schedule mylubbock.us
City of Lubbock Building Safety (Building Inspection) Building, mechanical, plumbing, and electrical permit fees; commercial plan review; minimum permit fee; reinspection; certificate of occupancy; sign; and contractor registration - in the Building Safety Fee Schedule (Ord 2024-O0111) mylubbock.us
City of Lubbock Development Engineering Public infrastructure plan review, testing, and inspection (water / sewer / paving); drainage analysis report review - in the Public Infrastructure Plan Review, Testing and Inspection Fees mylubbock.us
City of Lubbock (City Council under TLGC Ch. 395) Roadway, water, and wastewater impact fees, administered through the Capital Improvements Advisory Committee; current collection rate $0.00 for all areas mylubbock.us

West Texas Peer Jurisdictions

Lubbock is an isolated South Plains regional center with no adjacent published ZoneFee peers; the nearest covered West Texas anchors are the Permian Basin cities roughly 120 miles south. Compare development-side fee structures with nearby ZoneFee-covered jurisdictions:

See the full Texas jurisdiction directory, the ZoneFee coverage map, and our methodology for how these fees are sourced and verified.

Sources

Document Agency Accessed
2026 Planning Department Fee Schedule (1 page; SHA-256 f73399ce...) City of Lubbock, TX - Planning Department 2026-06-08
Building Safety Fee Schedule (FY effective Oct 1 2025 - Sep 30 2026; Ord 2024-O0111; 6 pages; SHA-256 4c1805dc...) City of Lubbock, TX - Building Safety 2026-06-08
Public Infrastructure Plan Review, Testing and Inspection Fees (Nov. 2023; 1 page; SHA-256 0cc70221...) City of Lubbock, TX - Development Engineering 2026-06-08
2025 Roadway Impact Fee Study Update (25 pages; max-assessable basis; SHA-256 378e896d...) City of Lubbock, TX - Roadway Impact Fee Study 2026-06-08
Impact Fees page (current $0.00 collection rate statement; SHA-256 5018e148...) City of Lubbock, TX - Development Engineering 2026-06-08

Last verified by ZoneFee: 2026-06-08. Fee schedules are subject to change. Verify current rates directly with the City of Lubbock before relying on this data for any financial decision.

This page reflects fee data sourced from the City of Lubbock 2026 Planning Department Fee Schedule (SHA-256 f73399ce...), the Building Safety Fee Schedule (Fiscal Year effective October 1, 2025 - September 30, 2026; Adopted Budget Ordinance No. 2024-O0111; SHA-256 4c1805dc...), the Public Infrastructure Plan Review, Testing and Inspection Fees (November 2023; SHA-256 0cc70221...), the official Impact Fees page (SHA-256 5018e148...), and the 2025 Roadway Impact Fee Study Update (SHA-256 378e896d...). ZoneFee does not guarantee that fee amounts are current at the time you read this page. Fee schedules change. Lubbock administers a Texas Local Government Code Chapter 395 impact-fee program, but the City has currently set all impact fees to $0.00 for all areas, so developers currently pay $0 in impact fees; the 2025 roadway study per-service-unit figures are the legal maximum-assessable basis, not amounts charged. Lubbock publishes no consolidated developer tap fee schedule (taps are installed by City-registered private contractors and the City-side capacity charge is the $0.00 impact fee), Texas jurisdictions do not use cash proffers, and the City's Public Improvement Districts levy annual tax-roll assessments rather than developer-facing permitting fees. Verify all current rates directly with the City of Lubbock before relying on this data for land acquisition, project budgeting, or any financial decision. This page is for research and due-diligence reference only - it is not legal or financial advice.