Skip to main content

Waxahachie, Texas - City Development Fees

Waxahachie | City | Ellis County | Dallas-Fort Worth-Arlington, TX MSA

Waxahachie is the seat of Ellis County, a DFW-south exurb on the Interstate 35E growth corridor. The City of Waxahachie Planning & Zoning, Building Inspection, and Public Works-Engineering departments administer water, wastewater, and roadway impact fees under the Texas Local Government Code Chapter 395 framework (adopted by Ordinance 3654 on August 18, 2025, and codified at Code of Ordinances Chapter 33, Article VII, Section 33-179), along with zoning, planned development, specific use permit, site plan, platting, and park land dedication fees published in the City Fee Schedule. The City operates its own water and wastewater utility; the developer-side water and wastewater capacity cost is captured in the impact fee, paid at water meter issuance. Verify current amounts with the City of Waxahachie before relying on them.

On this page
  1. Fee summary
  2. Impact fees
  3. Zoning and platting fees
  4. Coverage notes
  5. Fee authorities
  6. Sources

Fee Summary

Fee Type Status Top-Line Figure Effective Date
Impact Fees (Water / Wastewater / Roadway, TLGC Chapter 395) Confirmed Water and wastewater by meter size, 0.75-inch ultrasonic $9,357 combined (water $4,028 + wastewater $5,329) scaling to 12-inch turbine $1,871,400; roadway $1,380-$1,915 per service unit across five service areas 2025-08-18
Zoning and Platting Fees Confirmed Zoning change $500 + $10/acre; PD $1,000 + $20/acre; SUP $500 + $10/acre; site plan $500; plat/replat $500 + $10/lot; annexation $500; residential park land $400/dwelling unit in lieu -
Utility Tap Fees Unavailable via official sources The developer water and wastewater capacity charge is the impact fee (above), paid at water meter issuance; no standalone physical tap/meter-set fee schedule is published -
Special District Fees (PID / TIRZ) Not administered Tax Increment Reinvestment Zone No. 1 is tax-increment financing on the tax roll, not a standing City developer application fee -
Proffers Not applicable Texas jurisdictions do not use Virginia-style cash proffers -

Impact Fees (Water, Wastewater, and Roadway, TLGC Chapter 395)

Source: City of Waxahachie Fee Schedule (SHA-256 c558a75c...), which reproduces the codified Chapter 33, Article VII, Section 33-179 impact-fee tables, captured verbatim. The impact fees were adopted by Ordinance 3654 (adopted August 18, 2025, as amended). Water and wastewater impact fees are charged by meter type and size (per service unit equivalent) at water meter issuance; the roadway impact fee is charged per service unit at building permit issuance and varies by service area.

Water and Wastewater Impact Fees (by meter type / size)

Meter Type / Size (service units)WaterWastewaterTotal
0.75-inch ultrasonic (1)$4,028$5,329$9,357
1-inch ultrasonic (1.6)$6,444$8,526$14,970
1.5-inch ultrasonic (4)$16,112$21,316$37,428
2-inch ultrasonic (6)$24,168$31,974$56,142
3-inch ultrasonic (14)$56,392$74,606$130,998
4-inch ultrasonic (24)$96,672$127,896$224,568
6-inch ultrasonic (32)$128,896$170,528$299,424
6-inch turbine (56)$225,568$298,424$523,992
8-inch ultrasonic (80)$322,240$426,320$748,560
8-inch turbine (96)$386,688$511,584$898,272
10-inch ultrasonic (120)$483,360$639,480$1,122,840
10-inch turbine (152)$612,256$810,008$1,522,264
12-inch ultrasonic (160)$644,480$852,640$1,497,120
12-inch turbine (200)$805,600$1,065,800$1,871,400

Roadway Impact Fees (per service unit, by service area)

Roadway Service AreaAmount per Service Unit
Service Area 1$1,915
Service Area 2$1,380
Service Area 3$1,767
Service Area 4$1,778
Service Area 5$1,779

The roadway impact fee service area for a given property is identified on the City Interactive Map (Planning and Zoning group). Impact fee authority: City of Waxahachie Public Works-Engineering / Building Inspection.

Zoning and Platting Application Fees

Source: City of Waxahachie Fee Schedule (SHA-256 c558a75c...), Planning Application Types and Plat Application Types sections, captured verbatim. The City's published Fee Schedule page does not stamp a discrete adoption date for these application fee tables; the infrastructure inspection fee is governed by Ordinance 3442.

Planning and Zoning Fees

Fee ItemAmount
Zoning district change$500 + $10 per acre
Planned development$1,000 + $20 per acre
Specific use permit (SUP) or amended SUP$500 + $10 per acre
Site plan$500
Amended site plan$250
Variances or waivers$250
Annexation or de-annexation$500
Landscape plan or irrigation plan$100
Short-term rental registration or renewal$300 annually

Platting and Subdivision Fees

Fee ItemAmount
Plat or replat$500 + $10 per lot
Amended plat$350 + $10 per lot
Plat vacation$300
Land use study$250 + $10 per lot
Street name change (after plat approval)$100 per name changed
Plat-review consultant deposit$2,500 (adjusted to actual consultant cost at final plat)
Plat filingSubject to Ellis County Clerk recordation fees; ETJ plats subject to City + County plat fees

Park Land Dedication

Fee ItemAmount
Land dedicationTwo acres per 100 dwelling units
Cash in lieu of land dedication (residential)$400 per dwelling unit
Cash in lieu of land dedication (commercial)$600 minimum per acre

Zoning and platting fee authority: City of Waxahachie Planning & Zoning. The Infrastructure Inspection Fee is governed by Ordinance 3442 (refer to the ordinance for the calculation basis).

Coverage Notes - What This Page Does Not Cover

Per ZoneFee's Partial-Verified Publication Standard, the items below were not closed via confirmed standalone fee amounts on this page. They are disclosed here rather than estimated or omitted silently.

Utility Tap Fees

Waxahachie operates its own water and wastewater utility, but the developer-side water and wastewater capacity cost is captured under the impact fee above (the Water & Wastewater Impact Fee, paid at water meter issuance per Ordinance 3654 and Section 33-179). No separate standalone physical water-meter-set or tap connection fee schedule is published on the City Fee Schedule page or the Utilities and Public Works pages (five official paths probed; only monthly water consumption rates are published, which are out of developer scope). Closed-search outcome: this fee family is unavailable via official sources. A physical tap or meter-set charge may exist within building or utility processes but is not published in any located official source.

Special District Fees (PID / TIRZ)

Waxahachie has Tax Increment Reinvestment Zone No. 1 and a Community Development Corporation, but these are tax-increment and economic-development mechanisms financed on the tax roll, not standing City-administered developer application fees. No City special-district developer fee surfaced in the published Fee Schedule or the City sitemap. Closed-search outcome: this fee family is not administered by this jurisdiction.

Proffers

Texas jurisdictions do not use Virginia-style cash proffers (Virginia Code Section 15.2-2303 has no Texas counterpart). Developer-side contributions in Waxahachie occur through the impact fees, zoning, platting, and park land dedication fees captured above. Closed-search outcome: this fee family does not apply to this jurisdiction.

Fee Authorities

Authority Fee Types Official Website
City of Waxahachie - Planning & Zoning / Building Inspection / Public Works-Engineering Water, wastewater, and roadway impact fees; zoning, planned development, SUP, site plan, platting, and park land dedication fees waxahachietx.gov

Sources

Last verified by ZoneFee: 2026-06-19. Fee schedules are subject to change. Verify current rates directly with the City of Waxahachie Planning & Zoning, Building Inspection, and Public Works-Engineering departments before relying on this data for any financial decision.

This page reflects fee data sourced from the City of Waxahachie Fee Schedule (SHA-256 c558a75c...) and Ordinance 3654 (SHA-256 52f3ab8b...). ZoneFee does not guarantee that fee amounts are current at the time you read this page. Fee schedules change. Waxahachie administers Texas Local Government Code Chapter 395 water, wastewater, and roadway impact fees, adopted by Ordinance 3654 on August 18, 2025, and codified at Chapter 33, Article VII, Section 33-179. The developer water and wastewater capacity cost is the impact fee, paid at water meter issuance; no standalone physical tap fee schedule is published. Texas jurisdictions do not use Virginia-style cash proffers, and Tax Increment Reinvestment Zone No. 1 is tax-increment financing on the tax roll, not a standing City development fee. Verify all current rates directly with the City of Waxahachie before relying on this data for land acquisition, project budgeting, or any financial decision. This page is for research and due-diligence reference only - it is not legal or financial advice.