Georgetown, TX - Utility Tap and Connection Fees

City of Georgetown | Georgetown Utility Systems | Williamson County

These fees apply to new water, wastewater, and electric service connections in Georgetown. Rates vary by meter or pipe size (water and wastewater) or service configuration (electric). These tap and connection fees are separate from and in addition to Georgetown’s water and wastewater impact fees, which are covered on the Georgetown, TX development fees page.

Water Tap Fees

Effective November 5, 2025. Governing authority: Code of Ordinances Sec. 13.04.150. Source: Construction Fee Schedule Rev. 11.5.2025.

Water Meter Connection Rates

Meter Size Inside City Outside City
3/4 inch $640 $670
1 inch $730 $750
1½ inch $860 $880
2 inch $1,250 $1,270
3 inch $2,840 $2,900
4 inch $3,830 $3,900
6 inch $6,250 $6,380
8 inch $7,370 $7,490
10 inch $12,870 $13,020
12 inch $16,070 $16,220

Note: A trip fee may be added for any location where a meter is requested but is deemed incomplete, damaged, or not ready for installation upon city inspection.

Water Engineering and Inspection Fees

Use Type Inside City Outside City
Single-family residential (up to 4 units) $625 per dwelling unit $625 per dwelling unit
Multi-family residential (4 or more units) $400 per dwelling unit $420 per dwelling unit
RV spaces $80 per spot $80 per spot
Non-residential $0.25 per sq ft $0.25 per sq ft

Wastewater Connection Fees

Effective November 5, 2025. Governing authority: Code of Ordinances Sec. 13.04.160. Source: Construction Fee Schedule Rev. 11.5.2025.

Wastewater Connection Rates

Pipe Size Inside City Outside City
4 inch $300 $450
6 inch $450 $600
8 inch $650 $800
Greater than 8 inch Actual cost + $50 Actual cost + $50

Note: The Liberty Hill with Western District area (formerly Chisholm Trail) has a separate outside-city wastewater connection rate of $600. Meter plus actual cost of materials and labor applies for connections greater than 8 inch.

Wastewater Engineering and Inspection Fees

Use Type Fee
Single-family residential (up to 4 units) $620 per dwelling unit
Multi-family residential (4 or more units) $420 per dwelling unit
RV spaces $80 per space
Liberty Hill with Western District Water $60
Non-residential $0.25 per sq ft

Outside-City Utility Connection Application Fee

A separate application fee applies to all new utility connections outside the city limits, including ETJ (Extra Territorial Jurisdiction) and Western District areas. Source: Construction Fee Schedule Rev. 11.5.2025.

Fee Item Amount
Utility Connect Application Fee $100
Technology Fee $10

This application fee is in addition to the tap and connection fees listed above. It applies specifically to connections outside the city limits.

Electric Meter Connection Fees

Governing authority: Code of Ordinances Sec. 13.04.210. Source: Georgetown Electric Engineering - Electric Related Permitting Fees and Construction Fee Schedule Rev. 11.5.2025.

The Electric Meter Connect Fee covers the cost of providing the meter, installing the meter, the initial inspection, and related metering and engineering system updates. The fee applies to all new services, service relocations, rebuilds, upgrades, additions of Distributed Energy Resources (DER), and conversions from overhead to underground.

Service Type Fee Notes
Single-phase, 0-400 amps $200 Non-refundable. Assessed and paid prior to building permit issuance; processed through Permitting and Inspections.
Single-phase, greater than 400 amps Actual cost Line extension application required through Electric Engineering Department.
Commercial three-phase (all sizes) Actual cost Line extension application required. Contact electricengineering@georgetown.org or complete a line extension application.
Temporary meter $215 Non-refundable. Charged as part of the permit package. Covers cost of removing and installing a meter from a temporary pole to the building.
Trip fee (as needed) $120 per site visit Charged when work is to be performed by the electric utility but the job site is not ready.

For multifamily and commercial three-phase developments: meter connect fees are billed and collected along with line extension fees. Contact Georgetown Utility Systems Electric Engineering for commercial service connection requirements.

Administering Authority

Georgetown Utility Systems (City of Georgetown)

Type: City-operated combined utility - electric, water, and wastewater service

Georgetown Utility Systems is fully integrated into city government and is not an independent authority. Water, wastewater, and electric tap and connection fees are governed by Code of Ordinances Chapter 13.04 (Sec. 13.04.150, 13.04.160, and 13.04.210).

Official reference: Georgetown Utility Systems - georgetowntexas.gov/utilities/

Sources

Source 1 - Water and Wastewater Tap and Connection Fees:
City of Georgetown - Construction Fee Schedule Rev. 11.5.2025
Agency: City of Georgetown, Development Services - Permitting
Effective date: November 5, 2025 - Accessed: 2026-03-26

Source 2 - Electric Meter Connection Fees:
City of Georgetown - Electric Related Permitting Fees
Agency: City of Georgetown, Electric Engineering
No separate effective date stated in document; electric fees also appear in Construction Fee Schedule Rev. 11.5.2025 - Accessed: 2026-03-26

Last verified by ZoneFee: 2026-03-26

← Georgetown, TX development fees

This page reflects fee data sourced from official City of Georgetown documents as of the last-verified date above. ZoneFee does not guarantee that fee amounts are current at the time you read this page. Fee schedules are subject to change. Always verify binding fee amounts directly with the City of Georgetown or Georgetown Utility Systems before relying on this data for land acquisition, project budgeting, or any financial decision. This page is for research and due diligence reference only - it is not legal or financial advice.